What is the Current Status of CCS Facilities Around the World?

Written by Axens | Mar 21, 2022 8:30:00 AM

In 2021, the number of existing CCUS facilities worldwide is far below that planned within the SDS scenario.

 

Currently, 135 large-scale CCS facilities are at various stages of development:

  • 27 in operation (with an annual capture capacity of 36.6 MtCO2, so less than 1% of the 5.4GT CO2 expected in 2050)
  • 4 under construction
  • 58 in advanced development using a dedicated front end engineering design (FEED) approach (compared to only 13 in 2020)
  • 44 in early development (compared to 21 in 2020)
  • 2 are on hold.

 

The progress of commercial CCS facilities the last decade

 

Figure 1 shows the progress of commercial CCS facilities from 2010 to September 2021. 

 

Figure 1 - Pipeline of commercial CCS facilities from 2010 to September 2021 by capture capacity (Mtpa CO2) (Source: Global status of CCS, 2021)

 

Capacity decreased year on year between 2011 and 2017, probably due to factors such as public and private sector focus on short-term recovery after the global financial crisis.

 

Since 2017, there has been growth at the early and advanced development stages. However, it is important to note that the figure 1 does not include ten early development projects and five advanced development projects in the pipeline, for which no capacity has been announced. Consequently, some potential is underestimated.

 

The large increase in commercial CCS facilities in the first half of 2021 has led to project pipeline capacity levels not seen since 2011 – 149.3 Mtpa, with a 30% average annual growth rate since 2017.

 

 

How many more CCS facilities should be created to reach the levels expected in the SDS scenario?

 

The global geological storage capacity is by no means the limiting factor in what is required for CCS to achieve net-zero emissions under any scenario.

 

However, to reach the levels expected in the SDS, the number of industrial-scale facilities needs to increase from the 26 curently in operation to more than 2,000 facilities by 2050 – a number that would be even more elevated for the NZE2050 scenario.

 

According to Axens, this figure could easily be doubled based on current average capacities of CCS facilities. Consequently, it is particularly important to reduce the capital and operating costs (mainly energy requirements) of carbon capture technologies.

 

Large-scale CCS rollout

 

Beyond accelerating emissions abatement, the requested rapid scaleup of CCS technology provides a number of economic benefits, such as the creation of highly qualified jobs, the support of economic growth through new net-zero industries and innovation, and possible infrastructure reuse and the deferral of shutdown costs related to existing facilities.

 

Figure 2 - The whole CCS value chain (Source)


The full picture of a CCS project (illustrated in figure 2) involves three main components:

  • CO2 capture, achieved through a number of technologies and available at various levels of maturity,
  • CO2 transport mainly by pipelines or ships (in liquefied form), up to the
  • Storage facility.

Large-scale CCS rollout represents many challenges, the main one being the involved costs.